Lismore City Council - East Drain Clearing, Grubbing and Cleanout
Kyogle Earthworx undertook vegetation clearing, grubbing and drain cleanout works to improve drainage efficiency, restore water flow and reduce the risk of localised flooding.
Works involved the mechanical removal of woody vegetation and accumulated debris within the existing drain footprint, while minimising disturbance to surrounding vegetation, drain embankments and environmentally sensitive areas.
Key activities included:
Mechanical clearing and removal of woody vegetation within the designated drain footprint.
Mulching and reuse of vegetation onsite where practical to assist with ground stabilisation.
Protection and retention of identified native vegetation, including mature Sheoaks, Wattle trees and juvenile Bangalow Palms.
Installation of floating booms to assist with sediment and debris containment.
Implementation of designated work boundaries and environmental exclusion zones.
Daily fauna inspections and wildlife protection measures.
Removal of accumulated debris using specialised excavator attachments, without disturbing existing drain embankments.
Project Outcomes
The project was designed to deliver the following outcomes:
Improved Drainage Capacity: Removal of vegetation and accumulated debris to improve water flow through the existing drainage system.
Reduced Flooding Risk: Improved drainage performance to assist in reducing localised flooding and waterway blockages during heavy rainfall.
Environmental Protection: Preservation of significant native vegetation and protection of local wildlife and surrounding riparian habitats.
Minimised Ground Disturbance: Targeted clearing and cleanout activities restricted to the approved work area, maintaining the integrity of existing drain embankments.
Improved Waterway Maintenance: Restoration of drainage functionality to support ongoing Council maintenance and stormwater management.
Sustainable Vegetation Management: Reuse of suitable mulched vegetation onsite to assist with stabilisation and minimise waste disposal.
Project Summary
The East Drain Clearing, Grubbing and Cleanout project demonstrates Kyogle Earthworx's capability to undertake drainage maintenance and vegetation management works in environmentally sensitive areas.
Through the use of specialised earthmoving equipment, controlled clearing methods and site-specific environmental protection measures, the project aimed to improve drainage performance while minimising impacts on the surrounding environment.