Kyogle Shire Council - Main Creek Road - Landslide Remediation

Nov 12
2 min read

Kyogle Earthworx successfully completed comprehensive road and embankment remediation works involving pavement reconstruction, major drainage infrastructure upgrades, slope stabilisation and site rehabilitation.

The project required the remediation of pavement and embankment failures, together with improvements to roadside drainage infrastructure to enhance the long-term stability, safety and serviceability of the affected roadway.

The scope of works included:

1. Pavement Excavation and Reconstruction

  • Excavation and removal of approximately 60 lineal metres of affected road pavement.

  • Reconstruction of approximately 60 lineal metres of road pavement, incorporating a drainage layer.

  • Completion of pavement reconstruction works in accordance with the approved design drawings and Northern Rivers Local Guidelines (NRLG).

2. Roadside Drainage Improvements

  • Excavation and concrete lining of approximately 200 lineal metres of roadside spoon drains.

  • Installation of associated subsurface drainage infrastructure.

  • Upgrading of existing drainage systems to improve stormwater collection and discharge.

3. Culvert Installation and Stormwater Infrastructure

  • Supply and installation of two culvert crossings, each comprising three DN1200 reinforced concrete pipes (RCPs).

  • Completion of associated excavation, pipe installation, backfilling and reinstatement works.

  • Installation of rock riprap outlet protection to minimise erosion and scour at drainage discharge locations.

4. Embankment Remediation and Stabilisation

  • Excavation and removal of slipped material from the affected downslope embankment.

  • Construction of a rock fill buttress along approximately 40 lineal metres of the downslope embankment.

  • Completion of rock fill placement and associated stabilisation works in accordance with Transport for NSW Specification R44.

5. Site Rehabilitation

  • Rehabilitation and reinstatement of disturbed areas following completion of construction activities.

  • Completion of site rehabilitation works in accordance with Construction Specification Item 3.4.

Project Outcome

Kyogle Earthworx successfully delivered the road and embankment remediation works, incorporating pavement reconstruction, major culvert installations, roadside drainage upgrades, rock fill buttress construction and erosion protection measures.

The completed works improved the structural stability of the affected embankment, enhanced stormwater management and drainage capacity, and reinstated the road pavement to provide a safer, more resilient and serviceable road infrastructure asset.

The project demonstrated Kyogle Earthworx's capability to undertake complex road rehabilitation and slope stabilisation projects, including works completed in accordance with Transport for NSW specifications, Northern Rivers Local Guidelines and project-specific engineering requirements.


 
 
 